Relativistic
Nuclear
Technology (RNT)
Clean nuclear power for millennia
- U-235
- Uranium enrichment
- Weapons-grade materials
- Spent nuclear fuel (SNF)
- Depleted uranium (U-238)
- Thorium
The world needs reliable 24/7 clean energy
But these fuels are finite and increasingly costly to extract. Burning them just for energy – for both climate and economic reasons – is unsustainable.
Oil → materials & aviation
Coal → steel
Current nuclear power cannot close the gap: About 7.9 million tonnes of recoverable uranium supports today’s fleet of 415 reactors and only a few hundred more 1 GW units, IAEA ’22 making the existing fuel paradigm unscalable.
SNF contains fissile material you can make a bomb with – unsafe.
This is a physical and economic limit, not a policy choice.
Our solution: Relativistic Nuclear Technology (RNT)
Yes, we are building an accelerator-driven reactor – but RNT ≠ classical ADS.
| Parameter | ADS (classical electro-nuclear) | RNT (new generation) |
|---|---|---|
| Fuel | U-235 ≈20%, enriched, scarce | SNF, U-238, Th-232 — a fuel base for thousands of years. |
| Beam | ~1 GeV, protons | ~10 GeV, protons/deuterons, deep spallation |
| Coolant | Pb–Bi, activation and corrosion issues | Helium – clean, non-activating, high temperature |
| Regime | Near-critical (keff ≈ 0.95–0.97) | Deeply subcritical (keff ≈ 0.36–0.8) |
| Safety | Limited | Nuclear accident physically impossible |
| Resource | Decades; waste remains | Millennia; utilization of SNF |
| Proliferation | Contains U-235 / Pu (risk) | No weapons-usable material |
Relativistic Nuclear Technology (RNT) is…
An external accelerator creates neutrons that drive a deeply subcritical core of U-238 and spent nuclear fuel (SNF).
Not just theory – backed by experiments, infrastructure and a team ready to build.
Status today: TRL & validation
RNT builds on real experiments, existing hardware and a clear roadmap to a FOAK module.
For the investor this means:
- TRL 4–5 overall; accelerator subsystem at TRL 6–7.
- Clear roadmap to a FOAK RNT plant.
- IP and monetisation at every step.
A market measured in thousands of GW units
RNT’s core business is selling long-term, reliable clean energy: electricity and heat.
Competition – advanced reactors vs RNT
Almost all advanced reactors rely on scarce U-235/HALEU — making fossil-fuel replacement impossible and leaving waste and proliferation unresolved.
- Russia – BN-800 (fast reactor)
- China – TMSR-LF1 (thorium molten-salt test reactor)
- Russia – FNPP “Akademik Lomonosov” (floating NPP)
- China – HTR-PM (high-temperature gas-cooled reactor)
- TerraPower – Natrium
- Rolls-Royce – SMR
- X-energy – Xe-100
RNT instead uses abundant U-238 and nuclear “waste”, unlocking the other ~99% of uranium’s energy.
Business model
RNT is an energy company at its core.
We sell: Electricity, Heat, R&D / beam time and other services.
At $60–80/MWh: cumulative net cash flow ≈ $67–100 bn over plant lifetime.
Implied profit: ~3–5× CAPEX per station.
That implies potentially hundreds of trillions of dollars in cumulative revenue.
Team
Unique people. Unique infrastructure. No one else in the world can build this.
Ecosystem & talent pipeline: access to Russia’s nuclear infrastructure (a global leader in nuclear technology), partnerships with major centers (Obninsk – FEI, Dubna – JINR, NRC “Kurchatov Institute”), and a strong hiring pipeline from top technical universities (MEPhI, MIPT, Bauman MSTU and others).
Vision
A path to a FOAK-ready package and the first commercial RNT station.
6-year outlook
-
BWLAP — industrial-scale proton accelerator platform, ready for repeatable unit builds.
Early cash flows come from BWLAP accelerator unit sales, applied research, and related services. -
RNT concept – fully validated.
Reference R&D data set collected and published; models match experiment – a monetisable, licensable technology and IP base. -
Licensing & FOAK package ready.
FOAK-ready package for lenders/guarantors, enabling project finance and site deployment. -
1–2 pre-contracts signed (HPA/PPA).
Signed HPA/PPA frameworks → predictable revenues, anchor clients, acceleration to first commercial station.
Capital structure: HoldCo (IP/data) with institutional & state backing (regulatory expertise, infrastructure, PPP) + OpCo (team, licences, operations) + SPV/JV for pilots; FOAK-financing ready, IPO option.
Phases & budget
We are raising strategic equity to execute Phase 0 and Phase 1 and unlock a FOAK-ready package, paving the way to the first commercial RNT plant.
- Partnerships with key institutions and ~20 pre-design workstreams.
- U-70 upgrade & licensing strategy.
- Output: detailed Phase 1 budget/schedule and green light for KURS & R&D program.
- U-70 experiments + KURS design code; BWLAP industrial prototype.
- Licensing, safety case, team, sites, FEED.
- Output: validated tech, FOAK licensing/FEED pack, HPA/PPA pre-contracts → ready for project finance.
- Build first RNT power plant via SPV/JV with project debt and long-term PPA/HPA.
- Final CAPEX & schedule to be refined after Phase 1.
Strategic equity opportunity: participate in the company that will own RNT’s technology and intellectual property, and share in its future commercial value. Up to $800M is required across Phase 0 and Phase 1 to deliver the full development and validation programme. Investment terms and ownership stakes are agreed individually.
Own the next generation of nuclear power.
We are raising a strategic Round A to build the first relativistic nuclear pilot and unlock truly scalable clean energy.
We seek long-term partners: sovereign funds, strategic industrial players, and investors experienced in large-scale energy infrastructure.
For investment and partnership inquiries:
ir@rnt.energy